Can a packing machine pay for itself in 12 weeks? Work back from the quote
A small online store ships on Saturdays and Sundays. The owner wants a $720 machine to pay for itself in 12 weeks. How much expense must disappear on each packing day? This worked example excludes tax, interest and resale value.
Required gross savings per operating day = installed cost ÷ (target weeks × operating days per week) + extra cost per operating day.
Compare the same quote under two shipping schedules
| Packing schedule | Operating days in 12 weeks | Required savings per operating day |
|---|---|---|
| 2 days per week | 24 | $33 |
| 6 days per week | 72 | $13 |
Suppose the machine uses $3 in extra consumables per operating day. With two packing days a week, $720 ÷ 24 + $3 gives a $33 daily savings target. If actual costs fall by $18 per operating day, the net saving is $15. Payback then takes 24 weeks at two days a week or eight weeks at six.
Test your quote and shipping schedule in the free calculator
Change the installed cost, savings, extra cost and packing days. To share a scenario with a colleague, use figures you are comfortable sharing.
What to check before signing the quote
- Time several parcels of the sizes and weights you usually ship, first by hand and then with the machine.
- Estimate which expenses would actually fall, such as overtime or contract packing. Record time freed for other work separately.
- Try both peak and ordinary weeks. Look for the schedule that pushes payback past your deadline.
How much does one order leave after support time?
The per-order example on the workbook page shows how 12 minutes of support changes your advertising allowance. Open the answer before deciding whether the workbook fits your store.